Turnaround & interim management for mid-sized companies

Success Stories

The Lean Stitch (Textile & Garment)

SectorTextile/Apparel

RegionSouth Asia

Size1,200 Employees

Path chosenOperational reinvention

+22%

productivity in one quarter

12% → 2%

rejection rate

6%

sustainable net margin

The Challenge

A legacy garment factory producing fast fashion for Western brands was drowning in overheads. While the order book was full, the factory was losing money on every shipment due to extreme inefficiency, high rejection rates (quality control failures), and a bloated middle management structure. The owners were considering shutting down operations as they could not meet the payroll.

Our Solution

We implemented a “Brutal Lean” turnaround. The focus was strictly on “Cost per Minute” of the production line.

Execution

01

Management Delayering

We analyzed the org chart and found 6 layers of management between the floor workers and the CEO. We flattened this to 3 layers, unfortunately requiring the redundancy of 40 middle-managers who were not adding direct value to production.

02

Line Balancing

We re-engineered the sewing lines. By breaking down bottlenecks where garments were piling up, we increased the “flow” of the product. We introduced a piece-rate incentive system for the sewers, aligning their pay with their productivity.

03

Quality at Source

Instead of checking quality at the end (where fixing a mistake is expensive), we implemented QC checks at every 4th station. This reduced the final rejection rate from 12% to 2%.

The Outcome

Productivity increased by 22% within the first quarter without hiring new sewing staff. The rejection rate drop saved the company thousands of dollars in wasted fabric per month. The factory moved from a monthly loss to a sustainable 6% net profit margin, saving the jobs of over 1,000 factory floor workers who would have otherwise been unemployed.

More success stories

We built our Reputation on the Unconventional!

01Construction

~70%of jobs preserved

The Strategic Merger (Distressed M&A)

Southeast Asia · >600 Employees

A prominent Tier-1 construction firm in Southeast Asia, employing over 600 staff, faced imminent insolvency. Despite a strong order book, the company suffered from severe liquidity gaps caused by low-margin contracts,…

Integration into the largest client · Read More »

02Manufacturing (Injection Molding)

3% → 35%margin on the new product line

The “Commodity to Proprietary” Pivot (Manufacturing)

South-East Asia · 200 Employees

A contract manufacturer producing generic plastic components (caps, handles, casings) for the electronics industry was facing a crisis. Their margins were being crushed by cheaper competitors and constant underbidding.…

New purpose: Supplier to brand owner · Read More »

03Hospitality

25% → 55%low-season occupancy within 8 months

The “Seasonality Trap” (Hospitality Restructuring)

Southeast Asia · 150-Room Resort

A family-owned 4-star beach resort was on the verge of bankruptcy. The business model was heavily reliant on high-season European tourists. Rising energy costs meant the resort was bleeding cash for 7 months of the year…

Asset repurposing · Read More »

04Real Estate Development

5 monthsuntil construction resumed

The “Stalled Skyline” Revival (Real Estate Development)

Southeast Asia · Mixed-Use Project

A luxury mixed-use development (condominiums and retail) in a prime metropolitan area had stalled at about 60% completion. The developer, a local family office, had run out of cash due to a sudden spike in material…

Repositioning the product · Read More »

Confidential · Hands-on · Success-fee based

When time matters, speak to us first.